top of page

28th and Canyon Hotel Rehab

Owner:

Bison Holdings I, LLC

General Contractor: 

Milender White Construction

Contract Amount: $2.2 M+

Mountain Lake
Beach Huts
Ferris Wheel
Palm Trees
City Cycle
Misty Slopes
Fire Wood
Foggy Pier
Cafe in Autumn
Blue Stairway
Two Flamingos
Old City Street
River Boathouse

The 28th & Canyon project is located in the center of Boulder, Colorado. Approximately 90,0000 cubic yards of soils were removed from the 26 feet deep excavation, shored with the drilled concrete pier secant system. All truck loading occurred outside the excavation perimeter to avoid tracking soils onto public streets.

bottom of page