28th and Canyon Hotel Rehab
Owner:
Bison Holdings I, LLC
General Contractor:
Milender White Construction
Contract Amount: $2.2 M+
The 28th & Canyon project is located in the center of Boulder, Colorado. Approximately 90,0000 cubic yards of soils were removed from the 26 feet deep excavation, shored with the drilled concrete pier secant system. All truck loading occurred outside the excavation perimeter to avoid tracking soils onto public streets.